2025 availability (Updated on 14 September 2024)
Available:
All available slots through the end of August 2025 have been filled.
Room type A:
All the available slots has been filled.
Room type B:
All the available slots has been filled.
*The studio will be closed during the following periods.
01 Jan 2025 – 05 Jan 2025
10 Mar 2025 – 04 Apr 2025
28 Jul 2025 – 31 Aug 2025
*Spaces after 2025 September will be released in the spring of 2025.
How to go to the pottery studio
From Narita International Airport
Take Narita express from Narita International Airport to Tokyo station.
Take Shinkansen (bullet train) from Tokyo to Nagoya station.
Take a local train on JR Chuo line to Ozone station from Nagoya.
At Ozone station, get off the train and get out from the gate of JR line. Go to the platform of Meitetsu Seto line at Ozone station.
Take a local train on Meitetsu Seto line to Owari Seto station from Ozone.
Owari Seto station is the last stop of Meitetsu Seto line.
The pottery master (or his apprentice) will pick you up at the gate of
Owari Seto station.
Approximate time required: 4 to 4.5 hours
Approximate transportation cost: 15,000JPY/person
From Kansai International Airport
Take an express train from Kansai International Airport to Shin Osaka station.
Take Shinkansen (bullet train) from Shin Osaka to Nagoya station.
Take a local train on JR Chuo line to Ozone station from Nagoya.
At Ozone station, get off the train and get out from the gate of JR line. Go to the platform of Meitetsu Seto line at Ozone station.
Take a local train on Meitetsu Seto line to Owari Seto from Ozone.
Owari Seto station is the last stop of Meitetsu Seto line.
The pottery master (or his apprentice) will pick you up at the gate of
Owari Seto station.
Approximate time required: 3 to 3.5 hours
Approximate transportation cost: 11,000JPY/person
From Chubu International Airport
Take an express or a local train from Chubu International Airport to Kanayama station.
Take a local train on JR Chuo line to Ozone station from Kanayama.
At Ozone station, get off the train and get out from the gate of JR line. Go to the platform of Meitetsu Seto line at Ozone station.
Take a local train on Meitetsu Seto line to Owari Seto from Ozone.
Owari Seto station is the last stop of Meitetsu Seto line.
The pottery master (or his apprentice) will pick you up at the gate of
Owari Seto station.
Approximate time required: 1.5 hours
Approximate transportation cost: 1,600JPY/person